OKRs Tracking Q3 2022 (Design)
KR1: Secure quality and brand-feeling by having at least a weekly chat (5 in total) with 500 designs.
KR2: With the 500designs agency and the Software Engineering & Development team, launch website by June 28st 2022. Each daily delay costs 5% score.
KR3: Reach 0.5% CTR to quick-start guide through user-testing with 3-5 devs.
KR1: Create and upload a logo/brand package to our website for people to download no later than July 15th. Reach 25 downloads.
KR2: Set up a Figma Community account, post 1 project and reach 25 duplications. Each action gives individually 33,33% score.
KR3: Contribute directly to the SoMe distribution with design deliverables for a total of 3 newsletters and 3 banners showing Medusa Admin UI.